India's best property portal to buy property in India - Proptiger.com
mobilesiteConversionButtonText
mobilesiteConversionCallButtonText

Hoysala Evm

Price on request
Builder Price
1, 2, 3 BHK
Apartment
679 - 1,512 sq ft
Builtup area1 sq M = 10.76 sq ft
Project Location
Kakkanad, Kochi

Overview

  • Feb'18
    Possession Start Date
  • Completed
    Status
  • 1 Acres
    Total Area
  • 130
    Total Launched apartments
  • Nov'12
    Launch Date
  • New and Resale
    Availability

Salient Features

  • Spacious properties, skillfully designed residencies
  • Hoysala evm tower alfa and tower beta in kakkanad, kochi by hoysala projects builders is a residential project
  • The project offers apartment with perfect combination of contemporary architecture
  • And features to provide comfortable living
  • The apartment are of the following configurations: 1bhk, 2bhk and 3bhk

More about Hoysala Evm

Hoysala Projects is one of the reputed property developer and is extremely versatile to developing property suiting the ever evolving and dynamic desires of the real estate market.Hoysala Projects has introduced its residential project “Hoysala Evm”, that is a benchmark in property market and strategically nestled at Kakkanad,Kochi.

Approved for Home loans from following banks
  • HDFC (5244)

Hoysala Evm Floor Plans

  • 1 BHK
  • 2 BHK
  • 3 BHK
Floor PlanAreaBuilder Price
Hoysala Hoysala Evm (1BHK+1T (679 sq ft) 679 sq ft)
(1BHK+1T)
-
Floor PlanAreaBuilder Price
Hoysala Hoysala Evm (2BHK+2T (962 sq ft) 962 sq ft)
(2BHK+2T)
-
Hoysala Hoysala Evm (2BHK+2T (1,064 sq ft) 1064 sq ft)
(2BHK+2T)
-
Hoysala Hoysala Evm (2BHK+2T (1,255 sq ft) + Study Room 1255 sq ft)
(2BHK+2T + Study Room)
-
Floor PlanAreaBuilder Price
Hoysala Hoysala Evm (3BHK+3T (1,512 sq ft) 1512 sq ft)
(3BHK+3T)
-
Report Error

Hoysala Evm Amenities

  • Swimming Pool
  • Children's play area
  • Club House
  • Intercom
  • 24 X 7 Security
  • Indoor Games
  • Health Facilities
  • Internet/Wi-Fi
  • Party Hall
  • Jogging Track
  • Car Parking
  • Gymnasium
  • Rain Water Harvesting
  • Power Backup
  • Lift Available
  • Full Power Backup
  • Gazebo
  • Visitor Parking

Hoysala Evm Specifications

Doors
Main:
Teak Wood Frame and Shutter
Internal:
Hard Wood Door Frame with Skin Molded Door
Flooring
Balcony:
Ceramic Tiles
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Tiles
Walls
Exterior:
Acrylic Paint
Interior:
Emulsion Paint
Toilets:
Ceramic Tiles Dado up to 7 Feet Height Above Platform
Kitchen:
Glazed Tiles Dado
Others
Windows:
UPVC
Wiring:
Concealed Copper Wiring
Points:
Dining
Frame Structure:
RCC Framed Structure with Concrete Block Masonry Walls
Switches:
Modular Switches
Lobby:
Vitrified Tiles
Fittings
Kitchen:
Granite Platform with Stainless Steel Sink
Toilets:
Provision for Geyser

FAQs

NRIs ask this frequently
  • Do NRIs require consent of the Reserve Bank to buy immovable property in India?
    No, NRI's do not require permission to buy any immovable property in India other than agricultural/plantation property or a farmhouse.
  • Is there any limit on the number of housing properties that may be purchased by an NRI?
    There are no limits on the number of residential properties that may be bought by an NRI. However, repatriation (the process of converting a foreign currency into the currency of one’s own country) is allowed only in respect of two such properties.
Have any unanswered questions ?click here
Contact NRI Helpdesk on
Whatsapp(Chat Only)
+91-96939-69347
Contact Helpdesk on
Whatsapp(Chat Only)
+91-96939-69347

About Hoysala Projects

Images for Elevation of Hoysala Hoysala Evm
  • 29
    Years of Experience
  • 29
    Total Projects
  • 0
    Ongoing Projects

Discuss about Hoysala Evm

comment

Developer Network

  • 400+
    Reputed Developers
Disclaimer
PropTiger.com is not marketing this real estate project (“Project”) and is not acting on behalf of the developer of this Project. The Project has been displayed for information purposes only. The information displayed here is not provided by the developer and hence shall not be construed as an offer for sale or an advertisement for sale by PropTiger.com or by the developer.

The information and data published herein with respect to this Project are collected from publicly available sources. PropTiger.com does not validate or confirm the veracity of the information or guarantee its authenticity or the compliance of the Project with applicable law in particular the Real Estate (Regulation and Development) Act, 2016 (“Act”).
 Read Disclaimer