India's best property portal to buy property in India - Proptiger.com

Terminus The Pointe

Possession : May'28
Rera

Terminus The Pointe

₹ 3.61 Cr - ₹ 10.64 Cr
Builder Price
Home Loan EMI starts at ₹ 2.80 L
Configuration
4, 5, 6 BHK
Builtup area1 sq M = 10.76 sq ft
3,277 - 9,674 sq ft
Possession Status
Under Construction
Avg. Price
₹ 11,000 sq.ft
Overview
  • Possession Start Date
    May'28
  • Status
    Under Construction
  • Total Area
    37 Acres
  • Total Launched villas
    183
  • Launch Date
    Feb'24
  • Availability
    New
  • RERA ID
    P02400006721

Project Specifications

Doors
Main:
Decorative Main Door
Internal:
Designer Doors
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Walls
Exterior:
Acrylic Paint
Interior:
Sand Faced Plaster
Toilets:
Ceramic Tiles Dado up to 7 Feet Height Above Platform
Kitchen:
Ceramic Tiles
Fittings
Kitchen:
Provision For Chimney And Water Purifier
Toilets:
TOTO and GROHE Bathroom Fixtures
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Kitchen
Windows:
Aluminium Powder Coated Glazed Windows
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
Terminus The Pointe Floor Plans
  • 4 BHK
  • 5 BHK
  • 6 BHK
₹ 4.46 Cr
₹ 3.61 Cr
₹ 7.41 Cr
Terminus The Pointe Amenities

About Terminus Gollur Projects

Terminus Gollur Projects
  • Total Projects1
  • Ongoing Projects1

More projects by Terminus Gollur Projects

Similar Projects

Developer Network

  • 400+
    Reputed Developers
All information, images, videos, specifications, and representations related to the project displayed on PropTiger.com are provided by the developer and may differ from the actual property. Users are advised to independentlyverify all project details, approvals, registrations, and compliance under applicable laws, including RERA, before making any purchase decision. Proptiger acts only as a channel partner developer defaults, non-compliance, or actions taken by authorities regarding the project or developer. By using the platform, users also consent to being contacted for feedback or relevant communication, with the option to opt out at any time....
Chat support